Work out the OEE of a production line — free

Overall equipment effectiveness says what share of the planned time really produced good units. Availability, performance, quality: the calculation shows where capacity goes, and what it is worth.

The work centre

OEE of the work centre
70.4%

Overall equipment effectiveness = availability × performance × quality.

Availability
85.4%
Performance
84.1%
Quality
98.0%
Good units2,254 bags
Capacity over the planned time3,200 bags
Units lost946 bags
Margin lost over the period946,000 F
In Odoo: each work centre holds its capacity and rate, work orders record actual times and the stops declared on the shop floor. The work centre OEE report is in Manufacturing.
The method

What the calculation does.

Availability

410 running minutes out of 480: 85.4%. Missing: breakdowns, set-ups and cleaning.

Performance

2,300 bags out of a possible 2,733: 84.1%. Missing: slowdowns.

Quality

2,254 good bags out of 2,300: 98%. Missing: scrap.

OEE

85.4% × 84.1% × 98% = 70.4%: 5 h 38 of good bags in 8 hours.


© 2026 SENEDOO SAS, Dakar · Odoo is a trademark of Odoo S.A. · Privacy policy