Overall equipment effectiveness says what share of the planned time really produced good units. Availability, performance, quality: the calculation shows where capacity goes, and what it is worth.
The work centre
OEE of the work centre
70.4%
Overall equipment effectiveness = availability × performance × quality.
Availability85.4%
Performance84.1%
Quality98.0%
Good units2,254 bags
Capacity over the planned time3,200 bags
Units lost946 bags
Margin lost over the period946,000 F
In Odoo: each work centre holds its capacity and rate, work orders record actual times and the stops declared on the shop floor. The work centre OEE report is in Manufacturing.
The method
What the calculation does.
Availability
410 running minutes out of 480: 85.4%. Missing: breakdowns, set-ups and cleaning.
Performance
2,300 bags out of a possible 2,733: 84.1%. Missing: slowdowns.
Quality
2,254 good bags out of 2,300: 98%. Missing: scrap.
OEE
85.4% × 84.1% × 98% = 70.4%: 5 h 38 of good bags in 8 hours.